CCPP SAN PEDRO
Argentina

 

On behalf of SoEnergy, SIEMENS erected a gas turbine power plant in San Pedro, Argentina, in 2017. In 2018 SIEMENS was commissioned to extend the plant to a combined cycle power plant with a further gas turbine, three heat recovery boilers, a steam turbine and an air-cooled condenser.

convex ZT GmbH was assigned by SIEMENS with the detail design of the civil works.

Client:
SIEMENS Österreich GmbH
General contractor:
SIEMENS, Austria
Capacity:
100 MW
Start of construction:
May 2019
Operation:
Autumn 2020

-
Fotos:
SIEMENS