CCPP MELLACH
VERBUND is erecting a 830 MW gas fired combined cycle power plant in Mellach/Austria that shall start commercial operation 2011. SIEMENS AG from Germany was appointed as general contractor. Civil construction works are carried out by the consortium STRABAG-Porr from Austria.
The ground conditions on site made soil improvement measures necessary. Stone columns of 0,8 m diameter and 16 m length were installed on a square grid spacing of 1,5 m using the vibro replacement method. On behalf of the consortium STRABAG-Porr, the civil design works are carried out by Zorn & Nowy ZT GmbH and convex ZT GmbH. Furthermore, convex ZT GmbH assisted the site team of SIEMENS AG during the finalization of the punch items in steelwork construction.
Owner:
VERBUND, Austria
General contractor:
SIEMENS, Germany
Capacity (electrical):
830 MW
Cost:
€ 550 mill.
Operation:
2011