FLUE GAS DESULPHURISATION PLANT, TIMISOARA
AE&E has received an order from CET-Sud for the supply of a turnkey flue gas desulphurisation system (dry absorption) for the operational thermal power plant in Timisoara.
On behalf of AE&E, convex ZT GmbH is carrying out the entire construction permit and civil works detail design and site supervision works. The heavy structures of the plant are founded on Ø 0,6 m in-situ cast drilled reinforced concrete piles. The civil design had to follow both the European and the Romanian codes and regulations, in particular the seismic ones.
Owner:
CET-Sud/Timisoara Municipality
General contractor:
Andritz Energy and Enviroment AG & Co KG
Overall costs:
€ 20 Mill.
Construction costs:
€ 2 Mill.
Completion:
2013
-
Photos:
J. Lohmann, D. Novac